Skip to content

Update test base images (major)#5198

Open
renovate[bot] wants to merge 1 commit into
mainfrom
renovate/major-test-base-images
Open

Update test base images (major)#5198
renovate[bot] wants to merge 1 commit into
mainfrom
renovate/major-test-base-images

Conversation

@renovate

@renovate renovate Bot commented Jun 8, 2026

Copy link
Copy Markdown
Contributor

This PR contains the following updates:

Package Type Update Change
eclipse-temurin stage major 17-jdk-focal19-jdk-focal
mcr.microsoft.com/dotnet/aspnet final major 8.0-bookworm-slim9.0-bookworm-slim
mcr.microsoft.com/dotnet/sdk stage major 8.0-bookworm-slim9.0-bookworm-slim

Configuration

📅 Schedule: (UTC)

  • Branch creation
    • "on monday"
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@renovate renovate Bot added the dependencies Pull requests that update a dependency file label Jun 8, 2026
@renovate renovate Bot requested a review from a team as a code owner June 8, 2026 08:35
@renovate renovate Bot requested review from atoulme and jaronoff97 June 8, 2026 08:35
@renovate renovate Bot added the dependencies Pull requests that update a dependency file label Jun 8, 2026
@renovate renovate Bot force-pushed the renovate/major-test-base-images branch 5 times, most recently from 2492636 to 3dd40e8 Compare June 11, 2026 10:48

@swiatekm swiatekm left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

We need to test these before merging.

@iblancasa

Copy link
Copy Markdown
Member

We need to test these before merging.

Do you mean to check if we are receiving telemetry data? I think we added some tests for that at some point. Should we recover them?

@swiatekm

Copy link
Copy Markdown
Contributor

We need to test these before merging.

Do you mean to check if we are receiving telemetry data? I think we added some tests for that at some point. Should we recover them?

We do have tests covering that, but they use test images from main. We don't have tests running using test images built from a PR branch. So tests passing on this PR doesn't tell us anything.

@renovate renovate Bot force-pushed the renovate/major-test-base-images branch 6 times, most recently from 4b4fd9f to e482cc5 Compare June 15, 2026 08:49
@renovate renovate Bot force-pushed the renovate/major-test-base-images branch from e482cc5 to 2ad4b61 Compare June 25, 2026 04:41
@renovate renovate Bot force-pushed the renovate/major-test-base-images branch from 2ad4b61 to b94b2bd Compare June 29, 2026 09:04
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

dependencies Pull requests that update a dependency file

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants